A loft conversion, a removed chimney breast or a knocked-through wall with no building regulations paperwork often comes to light when a house is sold. Councils in England can give retrospective sign-off through a regularisation certificate, but it means proving the work complies, and that can mean opening it up.

By the Home Builders editorial team · Published · Last reviewed

planningengland

Loft under renovation with floorboards lifted to show joists and cables, lit by a yellow work lamp
Photo: Simon / Pexels

Many home improvement projects, including extensions, loft conversions and structural alterations, need building regulations approval before work starts, and a completion certificate when they are finished. When neither happened, the owner can ask the council to approve the work after the event. This is called regularisation. This guide covers England only and is general information, not legal or technical advice. Speak to your council's building control team, or a building surveyor, about your own property before you apply.

What a regularisation certificate is

The procedure is set out in regulation 18 of the Building Regulations 2010. It applies to "unauthorised building work": broadly, work done without a building notice or an application with full plans being given to the council, or without the required notice of starting work. If the council is satisfied that the work meets the requirements, either as built or after further work, it may give a regularisation certificate.

The certificate is evidence, but not conclusive evidence, that the requirements it lists have been met. It is the retrospective counterpart of the completion certificate described in our guide to building regulations sign-off.

Who can apply, and for what work

Councils only, not private inspectors

GOV.UK says regularisation is available from a local authority building control body only. A registered building control approver, the private-sector alternative described in our guide to full plans and building notice applications, cannot issue one.

For work on higher-risk buildings (at least 18 metres or 7 storeys high with at least 2 homes, or a hospital or care home), the Building Safety Regulator is the building control authority instead of the council, and this guide does not cover them.

The owner applies

Regulation 18 gives the right to apply to the owner. If you are buying a house with unauthorised work, the application would normally have to come from the seller before completion, or from you once you own it.

Work from 11 November 1985 onwards

Only work carried out on or after 11 November 1985 can be regularised. Croydon Council says it cannot help with work started before that date, and advises seeking the opinion of a chartered building surveyor instead.

Common examples

The London Borough of Richmond upon Thames names loft conversions and structural alterations, such as removing a chimney breast, as common work that is overlooked. Extensions, knocked-through walls, new drainage and replacement windows fitted without a registered installer can raise the same question.

How the process works

1. Talk to building control first

Croydon asks owners to contact it before applying, so it can explain what will be involved. That conversation is useful because the work needed to prove compliance can be significant.

2. Apply in writing

Under regulation 18, the application must include a statement that it is made under that regulation, a description of the unauthorised work and, so far as reasonably practicable, a plan of the work and a plan of any additional work needed to make it comply. Councils often ask for more. Wigan Council's guidance note lists a site location plan, scaled drawings, a specification and, where relevant, structural or thermal calculations, although it says less may be needed for minor work. Richmond asks for plans showing the layout before and after the work.

3. Opening up, tests and samples

The council can require the owner to take reasonable steps, including laying open the work for inspection, making tests and taking samples. Wigan gives foundations, floors, steelwork and lintels, wall and roof construction, and drainage as examples of what may need exposing. LABC's homeowner site mentions beams, pipes and insulation that have been covered up. Croydon warns that this can mean disturbing finishes and decorations and, in some cases, excavation. If an owner chooses not to expose the work, Croydon says it cannot issue a certificate and will not refund the fee.

4. The council's decision

After the inspection, the council must tell the applicant what work, if any, is needed for compliance, or that it cannot determine what is needed. Once it is satisfied that the requirements are met, it may issue the certificate.

Which rules the work is judged against

The work is judged against the building regulations that applied when it was carried out, not today's standards. A loft converted in 2005 is assessed against the 2005 requirements, for example. The council can also take into account any relaxation or dispensation of a requirement given under the Building Act 1984. Because the date matters, keep any invoices, photographs or correspondence that show when the work was done.

What it costs

There is no national fee. Under the Building (Local Authority Charges and Amendments Relating to Charging) (England) Regulations 2026, the regularisation charge is payable when the application is made, and an application made without it is not valid. Each council sets its own charges. As one example, Richmond currently asks for 120% of its plan charge. Treat any figure as indicative, and check your own council's current charging scheme. Our guide to the building control charging changes explains the new rules.

The charge is not the only cost. Opening up and making good, drawings, calculations and any remedial work are separate costs to budget for.

Is regularisation compulsory?

Richmond says there is no legal requirement to apply for a regularisation certificate, but there is a legal requirement to comply with the building regulations. Contravening them is an offence under section 35 of the Building Act 1984. Under section 36, the building control authority can serve a notice requiring non-compliant work to be removed or altered, and the Act now allows such a notice up to 10 years after the work was completed. GOV.UK also warns that without approval you will not have the certificates of compliance you may need when you sell your home.

Regularisation does not cover planning

Building regulations and planning permission are separate regimes, and a regularisation certificate says nothing about planning. Croydon reminds owners to check whether planning permission was also needed. If it was, and the work went ahead without it, a planning application can be made for development already carried out under section 73A of the Town and Country Planning Act 1990. Our guides to householder planning applications and Lawful Development Certificates explain the options. Where the work affected a shared wall, our guide to the Party Wall etc. Act 1996 may also be relevant.

A practical checklist

  1. Find out what was done and when, and gather any paperwork, including competent person certificates for electrics, gas or windows.
  2. Ask your council's building control team whether it holds any record of the work.
  3. Discuss the case with building control, or a building surveyor, before applying.
  4. Prepare plans of the work as built and of any work needed to make it comply.
  5. Budget for the council's charge, opening up, making good and any remedial work.
  6. Check the planning position separately.

If remedial work is needed, you can request quotes from independent builders. Home Builders does not carry out building work: we ask advertisers to provide proof of insurance, and any contract is between you and the builder you choose.

Sources: The Building Regulations 2010, regulation 18; Building Act 1984, section 35 and section 36; The Building (Local Authority Charges and Amendments Relating to Charging) (England) Regulations 2026, regulation 6; Town and Country Planning Act 1990, section 73A; GOV.UK: building regulations approval; GOV.UK: building regulations approval, how to apply; Croydon Council: unauthorised building work and regularisation certificates; London Borough of Richmond upon Thames: how to make a regularisation application; Wigan Council: building regulations guidance note, regularisation applications (PDF); LABC Front Door: Ask Anna.

Frequently asked questions

Can I get building regulations approval after the work is done?

Possibly, if the work was carried out on or after 11 November 1985 and the council is satisfied that it meets the rules that applied at the time. The owner applies to the council for a regularisation certificate under regulation 18 of the Building Regulations 2010. A private registered building control approver cannot issue one.

Will I have to open up the work?

Possibly. The council can require work to be laid open for inspection, tested or sampled, for example foundations, steel beams, drainage or insulation. Croydon Council says it cannot issue a certificate if the owner chooses not to expose the work.

Is the work judged against today's building regulations?

No. Regulation 18 judges the work against the requirements that applied when it was carried out, taking account of any relaxation or dispensation given under the Building Act 1984.

Does a regularisation certificate mean I have planning permission?

No. It covers building regulations only. If planning permission was needed and not obtained, that has to be dealt with separately, for example through a retrospective planning application.

Advertising disclosure: Home Builders is funded by builders who advertise with us. Advertisers have no say over our guides, and listing is not an endorsement. Read our editorial policy.

Request quotes · UK introductions

Get matched with a local builder

Tell us about your extension, loft or renovation anywhere in the UK. With your consent, we pass your enquiry to up to 3 independent builders who advertise with us, so they can contact you with quotes. We do not carry out building work ourselves.

  • Free to use, no obligation
  • Up to 3 builders, only with your consent
  • Always check each builder’s insurance, references and written quote
About you

Optional. Add it only if you're happy for the builders we pass your enquiry to to call you.

Your project

Please don't include bank, payment or health details.

Budget & timing

Builders listed on Home Builders are independent businesses. We ask every builder who advertises with us to provide proof of current public liability insurance before they are listed. Always check each builder's insurance, references, written quote and trade body membership yourself before work starts. Forms are processed on homebuilders.co.uk.